DAWN - Framing Camera
DA-FC-MPAE-RP-287
Issue: 1
Revision: a
01/02/2010
Prepared by:
Thorsten Maue
Pablo Gutierrez
prepared by: Thorsten Maue (signature/date)
approved by: Pablo Gutiérrez-Marqués (signature/date)
Iss./Rev. Date Pages affected Description 1 01/02/2010 all first release
Holder Issue/Revision D 1 2 Configuration File (Doc) MPS KMA AYE IB Büttner JB Bukatz UC Christensen RE Enge WG Goetz PGM Gutierrez-Marques HH Hartwig HUK Keller WK Kühne AN Nathues HP Perplies MR Richards RS Schäfer KS Schneider ISE Sebastian HIS Sierks MS Sperling ISZ Szemerey DLR Carsenty DLR Jaumann DLR Mottola IDA Fiethe IDA Michalik IDA Bubenhagen JPL Miller JPL Pavri OSC Violet Legend: A - Approval C - Copy U - Updated Pages
1. General aspects ...................................................... 1 1.1 Scope ........................................................... 1 1.2 Introduction .................................................... 1 1.3 Applicable Documents ............................................ 1 1.4 Reference Documents ............................................. 1 2. Results .............................................................. 2 2.1 General ......................................................... 2 2.2 FC1 performance ................................................. 2 2.2.1 Extra charge ............................................. 2 2.3 FC2 performance ................................................. 3 2.3.1 Extra charge ............................................. 3 2.4 Streaks ......................................................... 4 3. Operational log ...................................................... 7 3.1 2008-093 (2008-04-01) ........................................... 7 3.2 2008-094 (2008-04-02) ........................................... 10 3.3 2008-095 (2008-04-03) ........................................... 15List of Figures
Figure 1: Accumulated histogram of pixels showing extra charge on FC1 .........3 Figure 2: Accumulated histogramof pixels does not show any extracharge on FC2..3 Figure 3: Three streaks on FC2_2008-04-03T02.39.12.707Z_ID10_0000000882_F1 ....4 Figure 4: Three streaks on FC2_2008-04-03T02.39.27.845Z_ID10_0000000883_F1 ....5 Figure 5: Two streaks on FC2_2008-04-03T02.39.38.025Z_ID10_0000000884_F1 ......5 Figure 6: Two streaks on FC2_2008-04-03T02.40.17.810Z_ID10_0000000885_F1 ......6 Figure 7: One streak on FC2_2008-04-03T02.49.17.694Z_ID10_0000000897_F7 .......6List of Tables
Table 1: Relation of the streaks found in the DC014 images .............4
This document reports the results of the operation of the Dawn Framing Cameras in the frame of DC014.
The Framing Camera test slot within DC014 was intended to replace the onboard software for both cameras and perform a minimal functional checkout afterwards.
To this end, both cameras were operated one at a time, first replacing the software and then performing the set of operations known as “CCD mini cal”. This set includes some image acquisitions aimed at the detection and evaluation of extra charge.
Operationally, the test was a success: the software of both cameras was replaced and all 72 images were retrieved from each of the cameras. There was a minor hiccup when the camera was commanded to get ready for power down while the mechanisms were off, but the problem was later solved and the lesson learnt for further occasions.
About the content of the images, it is remarkable that several streaks were found, even more than one in some images. A detailed account is reported on section 2.4.
Section 3 includes the operational log from the FC team.
no. document name document number, Iss./Rev. AD1
no. document name document number, Iss./Rev.
The main result obtained from the DC014 operation slot was the update of the flight software of both FC1 and FC2 to version 3.03.02. As a side bar, the operations served as additional monitoring point of the condition of the cameras by the execution of the CCD mini cal, reporting below. A general remark is that all images were received successfully on ground for both instruments. Additional, it is worth mentioning that in this un-targeted activity the solar elongation was close to the exclusion zone, causing a visible amount of out-of-field stray light in most of the images.
Also during the operation slot, several streaks were found and reported hereafter.
Finally, an operation error was found in the FC sequences. The nominal power-down sequence, which includes FCPrepPowerDown shall not be used immediately after flight software update. The usual procedure of changing the LLSW and the UDP library together results in the UDP library not booting spontaneously after upload. This results in the MCU not being powered on during the whole on-phase of the UDP library upload (the UDP library switches on the MCU during the boot). As a consequence, if FCPrepPowerDown is sent, the UDP library will find a non-responsive MCU and will flag the mechanisms as failed, preventing their operation until maintenance is conducted for clearing the flag. This operational work around shall always be regarded when replacing the flight software of the cameras.
2.2.1 Extra charge
As already detected earlier the extra charge on FC1 could be verified to be still present and not having changed significantly.
The extra charge measurements during DC014 where done with different pre illumination times, allowing the extra charge to accumulate prior to the exposure. Figure 1 shows the accumulated frequency of DNs all the 1024x1024 pixels. The six different graphs show the level of extra charge for six different illumination times (from bottom to top: 1.3 s, 2.3 s, 3.3 s, 4.3 s, 6.3 s, 11.3 s). The most effected pixels show extra charge of up to 200 DNs.
Figure 1: Accumulated histogram of pixels showing extra charge on FC1
2.3.1 Extra charge
No traces of extra charge could be found on FC2 during DC014. Figure 2 shows only the up to 5 DNs noise consisting of readout noise and photon noise.
Figure 2: Accumulated histogram of pixels does not show any extra charge on FC2
Several streaks were identified in the images taken during this operational slot. The following table identifies the images where one or more were found.
Image Streak location FC2_2008- 0403T02.39.12.707Z_ID10_0000000882_F1 One in the upper center One at the bottom left One at the bottom right FC2_2008- 0403T02.39.27.845Z_ID10_0000000883_F1 One in the upper center One at the bottom left One at the bottom right FC2_2008- 0403T02.39.38.025Z_ID10_0000000884_F1 One in the upper center One at the bottom right FC2_2008- 0403T02.40.17.810Z_ID10_0000000885_F1 One in the upper left One at the bottom center FC2_2008- 0403T02.49.17.694Z_ID10_0000000897_F7 One long streak in the upper center and right
Figure 3: Three streaks on FC2_2008-04-03T02.39.12.707Z_ID10_0000000882_FI
Figure 5: Two streaks on FC2_2008-04-03T02.39.38.025Z_ID10_0000000884_F1
Figure 6: Two streaks on FC2_2008-04-03T02.40.17.810Z_ID10_0000000885_F1
Figure 7: One streak on FC2_2008-04-03T02.49.17.694Z_ID10_0000000897_F7
2008-093T00:00:30Z EGSEs at MPS and DSC up and running. Telemetry if flowing from the s/c.
On the phone Carol pointed out that technically it would be possible to run the whole FC2 activity in today's pass, but we have to be very careful to avoid colisions with absolutely timed activities that are scheduled to start close to the end. Pending a more careful revision of the time available, the decision has been to start with the SW update and reconsider the options once it is clear.
00:11:28Z Radiation of dz109a to switch of FC2 CCD heaters
001506Z Radiation completed of di3280
002022Z Radiation started of di3281 002400Z Radiation completed
002548Z Radiation started of di3282 002952Z Radiation completed
003000Z The CCD heaters are off and the temperature is sinking
003124Z Radiation started of di3283 003520Z Radiation completed
Flight reports that the T/C speed today is 2kbps, so the transimission time is approximately 3 min 20 s per file.
It has been agreed that, for safety reasons, the UDP library upload will not start until confirmation is recieved that the LLSW completed successfully and FC2 is off.
Flight reports that mission has decided to stay with FC2 SW upload today and leave FC2CCD minical for tomorrow.
At this time the commanding will wait for confirmation that all 8 files are in their corresponding buffers.
Confirmation of 5 files in the buffers.
044856Z The LLSW and UDP library upload went nominal, but the execution of FCPrepPowerDown with MCU off has probably resulted in flagging both mechanisms as failed. After discussion with the mission it has been agreed to power up FC2 for 5 minutes to get a confirmation that this is the case and prepare contingency products for both FC1 and FC2 to solve the situation.
051115Z FC2 is powered and shows the failed mechansim on. Powering down with nominal sequence. ERT 052752Z
053900Z FC2 is powered off. The anomaly description has been sent to Flight manager together with the contingency products to tackle it.
2008093T201000Z Connection established from FSTB3 to DSC for verification of the contingency products for clearing the Mechanism Failure flags.
201700Z Power up and boot ok, patch ok, FCPrepPowerDown behaved nominal, Power down ok.
201845Z Second power up ok, shows the failure flags cleared through the power cycle.
202530Z FC2 is off. Reconfiguring camera and EGSE for FC1 run of the contingency products. As the flags have been corrected already, the sequence for FC1 will be powerup, contingency file and power down. This will confirm that the commands areunderstood by the camera and the correctness of the parameters can be verified by inspection.
203000Z FC1 is on. Booting completed nominal.
203300Z FC1 has received and executed both commands on the contingency product. Proceeding to power down.
203510Z FC1 is off.
2008094T000000Z The Command Approval Meeting has been completed with agreement that 5 files will be sent to FC2 for fixing the Mechanism Failure Flags:
The sequences will be 5 min apart except the last, that would require TWLT to confirm that the patch has worked.
023636Z Flight confirms that the FC1 LLSW files can be uploaded at this point, posing less of a load to the s/c than during playback. ACE will enqueue the files 1 through 8 and confirm only after completion. If any file were missing at the time FC1 operationsshould start, it would be resent and confirmed prior to the beginning of FC1 operations.
023832Z Extra charge block completed with 28 commands and 51 images. Starting pre-imaging darks
024359Z Pre-imaging darks completed with 31 commands and 54 images. Opening door. Door is open nominally. 32 commands and 54 images
In prevision of a station hand-over comming up between 0555 and 0615, all commanding will be suspended from 0550 until re-acquisition of commanding capability. Systems is verifying that the transmitter of the next station is in green.