Iss./Rev. Date affected Description
Draft 22/7/2010 All first version
D/a 28/7/2010 All Editorial revision by AN
D/b 29/7/2010 All Editorial revision by SSc
1/ 20/7/2010 10 Added Ceres image to conclusions
Promoted to issue 1
Holder Issue/Revision
D 1 2
Configuration File (Doc)
MPAe
IB Büttner C
UC Christensen
PGM Gutiérrez-M. C C
TM Maue C C
AN Nathues A A
MLR Richards C C
SSc Schröder C C
HSI Sierks C C
ISZ Szemerey
DLR Carsenty
DLR Jaumann
DLR Michaelis
DLR Mottola C
IDA Fiethe
IDA Michalik
JPL Raymond C
JPL Polanskey C
UCLA Joy C
Legend:
A -Approval
C -Copy
U -Updated Pages
1 General aspects......................................................... 1
1.1 Scope............................................................... 1
1.2 Introduction........................................................ 1
1.3 Applicable Documents................................................ 1
1.4 Reference Documents................................................. 1
2 Description of the activities........................................... 1
2.1 Overview............................................................ 1
2.2 FC1 non-pointed semi-annual checkout and UDP library patch.......... 2
2.3 FC2 pointed semi-annual checkout and UDP library patch.............. 2
2.4 Geometrical cross-calibration....................................... 3
3 Operations summary...................................................... 3
4 Health status assessment................................................ 3
5 Image analysis.......................................................... 4
5.1 Exposure times..................................................... 4
5.2 Dark current....................................................... 4
5.3 Extra charge....................................................... 6
5.4 Canopus positions.................................................. 7
6 Conclusions............................................................ 9
Figure 1: FC1 dark current on DC041......................................... 4
Figure 2: FC2 dark current on DC041......................................... 5
Figure 3: FC1 hot pixel histogram in DC041.................................. 5
Figure 4: FC1 hot pixel histogram in ICO.................................... 5
Figure 5: FC2 hot pixel histogram in DC041.................................. 6
Figure 6: FC2 hot pixel histogram in ICO.................................... 6
Figure 7: FC1 extra charge levels in DC041.................................. 7
Figure 8: FC1 extra charge levels in DC034.................................. 7
Figure 9: Canopus position in DC041......................................... 8
Figure 10: Canopus position in DC038......................................... 8
TABLE 1: Target selection for FC2 pointed semi-annual checkout............... 2
Table 3: Canopus position in DC041........................................... 9
This document contains the operations reports as well as the results of the analysis of the data acquired by both Framing Cameras during the DC041 operational slot. The scope of the activities was exclusively engineering, so no associated science report will be released.
This report is structured in several parts.
Section 2 describes the conducted operations, including the different activities and a brief description of each.
Given that this was partly a re-run of a former activity, all sequences were merged into the background sequence, so no activity log is provided. Instead, a brief summary of the execution of the activity is included in section 3.
Section 4 reports on the general health status of the cameras.
Section 5 explains the evolution of the sensors since launch and analysis their change in performance.